Carver High School

About Project

This high school formerly know as George Washington Carver Comprehensive High School was re-purposed to serve as the vocational technology transfer campus for the Atlanta Public School System. The new buildings designed to be compatible with it’s Gothic style and arranged in two quadrangles have “open air connectors” with custom arched extruded aluminum walkway covers.

Location

Atlanta, GA

Market

K Thru 12

Product

Aluminum Walkway Covers & Canopies

Architect

SIZEMORE GROUP/ ALLAIN & ASSOCIATES, INC.

Contractor

WINTER CONSTRUCTION

Scope:

Semi-Barrel Shaped Canopy – 11,700 s.f.

Features:

Semi-arc beams are employed in the canopy systems design provide a custom barrel-shape configuration.

Finish:

A 2-coat Kynar in Valspar’s standard Bone White

Components:

Canopies
Columns – 4″ x 4″ and 6″ x 6″
Beams – 6″ x 4″ and 6″ x 6″
Deck – 300 and 600 Series
Fascia – 6″ Standard